New Arrival China Track Link Assembly - Sell bulldozer track pad bolts nuts – Globe Truth
New Arrival China Track Link Assembly - Sell bulldozer track pad bolts nuts – Globe Truth Detail:
Product imformation:
1) bolt and nut raw material:40CR,35CRMO
2) bolt and nut Grade:10.9,12.9
3)Finish color: grey, black
4)Machine: Heating forging machine
Design / Structure / Details Pics

Plow bolt testing results:
| NAME OF SAMPLE | PLOW BOLT | DESCRIPTION | DIAMETER >16 | |||||
| MARKS | RAW MATERIAL | 40Cr | ||||||
| GRADE | GRADE:12.9 | QUANTITY | 4 | |||||
| NBIS | JB/T 5932.5-1991THE BOLT IS USED TO THE CUTTING TIP of Bulldozer,Scooptram and Grader | |||||||
| RESULTS | Chemical Composition | The Chemical Composition of Raw Material% | ||||||
| Name | C | Si | Mn | Cr | RESULT | |||
| Standard Value | min | 0.37 | 0.17 | 0.5 | 0.8 | |||
| max | 0.44 | 0.37 | 0.8 | 1.1 | ||||
| Measured Value | 0.39 | 0.23 | 0.68 | 0.92 | Qualified | |||
| HARDNESS | Standard Value | HRC38-42 | ||||||
| Measured Value | 1# | 2# | 3# | 4# | RESULT | |||
| 39 | 40 | 42 | 41 | Qualified | ||||
| TEST DATE | REPORT DATE | |||||||
komatsu track bolts and nuts:
| EX60 | 203-32-21210 | 01803-01420 |
| EX60-2 | 203-32-21210 | 01803-01420 |
| EX60-3 | 203-32-21210 | 01803-01420 |
| EX60-5 | 203-32-21210 | 01803-01420 |
| EX60LC-3 | 203-32-21210 | 01803-01420 |
| EX60LC-5 | 203-32-21210 | 01803-01420 |
| EX80-5 | 203-32-21210 | 01803-01420 |
| EX90 | 203-32-21210 | 01803-01420 |
| EX100 | 7H3597 | 1X11408 |
| EX100-2 | 7H3597 | 1X11408 |
| EX100-3 | 7H3597 | 1X11408 |
| EX100-5 | 7H3597 | 1X11408 |
| EX120-1 | 7H3597 | 1X11408 |
| EX120-2 | 7H3597 | 1X11408 |
| EX120-3 | 7H3597 | 1X11408 |
| EX120-5 | 7H3597 | 1X11408 |
| EX130H-5 | 7H3597 | 1X11408 |
| EX150 | 7H3597 | 1X11408 |
| EX150LC-5 | 135-32-11211 | 79039445 |
| EX160LC-5 | 135-32-11211 | 79039445 |
| EX200 | 135-32-11211 | 79039445 |
| EX200-1 | 135-32-11211 | 79039445 |
| EX200-2 | 135-32-11211 | 79039445 |
| EX200-3 | 135-32-11211 | 79039445 |
| EX200-5 | 135-32-11211 | 79039445 |
| EX200LC | 135-32-11211 | 79039445 |
| EX200LC-2 | 135-32-11211 | 79039445 |
| EX200LC-3 | 135-32-11211 | 79039445 |
| EX200LC-5 | 135-32-11211 | 79039445 |
| EX220 | 14X-32-11210 | 134-32-61221 |
| EX220-2 | 14X-32-11210 | 134-32-61221 |
| EX220-3 | 14X-32-11210 | 134-32-61221 |
| EX220-5 | 14X-32-11210 | 134-32-61221 |
| EX220LC | 14X-32-11210 | 134-32-61221 |
| EX220LC-2 | 14X-32-11210 | 134-32-61221 |
| EX220LC-3 | 14X-32-11210 | 134-32-61221 |
| EX220LC-5 | 14X-32-11210 | 134-32-61221 |
| EX230-5 | 14X-32-11210 | 134-32-61221 |
| EX230LC-5 | 14X-32-11210 | 134-32-61221 |
| EX270-1/2 | 14X-32-11210 | 134-32-61221 |
| EX270-5 | 14X-32-11210 | 134-32-61221 |
| EX270LC-1/2 | 14X-32-11210 | 134-32-61221 |
| EX270LC-5 | 14X-32-11210 | 134-32-61221 |
| EX300-1/2/3 | 14X-32-11210 | 134-32-61221 |
| EX300-5 | 207-32-51210 | 207-32-51220 |
| EX300LC-1/2/3 | 14X-32-11210 | 134-32-61221 |
| EX300LC-5 | 207-32-51210 | 207-32-51220 |
| EX330-5 | 207-32-51210 | 207-32-51220 |
| EX330LC-5 | 207-32-51210 | 207-32-51220 |
| EX400-2/3 | 208-32-51210 | 208-32-5122A |
| EX400-5 | 208-32-51210 | 208-32-5122A |
| EX400LC-2/3 | 208-32-51210 | 208-32-5122A |
| EX400LC-5 | 208-32-51210 | 208-32-5122A |
Products factory
Products show
Products testing
Products packing and shipping
Products factory
Products show
Products testing
Products packing and shipping
Product detail pictures:


Related Product Guide:
As for competitive charges, we believe that you will be searching far and wide for anything that can beat us. We will state with absolute certainty that for such excellent at such charges we have been the lowest around for New Arrival China Track Link Assembly - Sell bulldozer track pad bolts nuts – Globe Truth, The product will supply to all over the world, such as: Vietnam, Egypt, New Zealand, We welcome customers from all over the world come to discuss business. We supply high quality products, reasonable prices and good services. We hope to sincerely build business relationships with customers from at home and abroad, jointly striving for a resplendent tomorrow.
Staff is skilled, well-equipped, process is specification, products meet the requirements and delivery is guaranteed, a best partner!










