Factory Supply Bulldozer Track Chains - 13G-32-00010 D61EX-12 track chain track link dozer undercarriage parts – Globe Truth
Factory Supply Bulldozer Track Chains - 13G-32-00010 D61EX-12 track chain track link dozer undercarriage parts – Globe Truth Detail:
Basic information
Part Name | Dozer link assy |
Model/Parts no. | D85ESS-2 |
Working environment | Mining/quarry/rocky/construction/earthmoving/sand |
Warranty: | 6 month or 1200 working hours |
Material | 35MnB |
Surface hardness | 50-56HRC |
Surface hardening | 6mm(standard 4-8mm) |
Heat treatment | Full enough |
Colour | Black or yellow |
Delivery time | 30 days |
Packing | Seaworthy fumigate pallet |
MOQ | 2pcs |
Technical drawing | Supply when order established |
Technical drawing
Analyze component | |||
![]() |
![]() |
![]() |
![]() |
The track link has been done special hardening treatment which ensures its high strength and excellent abrasion resistance&inductive harden surface | The bushing shaft has been carburized and quenched the surface with medium frequency,which guarantees its reasonable hardness of core and abrasion resistance of the inner and outer surfaces. | The pin shaft is quenched the surface with medium frequency after quenching and tempering,which ensures its sufficient core strength and wear-resistance of inner and outer surfaces. | Lubricated track link assemblies subassemblies,such as oil seals,are made from world well-known brands.high-quality oil seals guarantee the maximum longevity of lubricated track link assemblies. |
Model list
EXCAVATOR | ||||||||
Model |
Pitch (mm) |
Bolt hole (mm) |
Model |
Pitch |
Bolt hole |
Model |
Pitch (mm) | Bolt hole (mm) |
E70B | 135 | PC15 | 101 | SK015 | 90 | |||
E110B | 171 | 16.5 | PC20/PC30 | 101.6 | SK40 | 135 | ||
E320 | 190 | 20.5 | PC40-7 | 135 | 12.5 | SK100 | 171 | 16.5 |
E325 | 203 | 20.5 | PC60-5 | 135 | 12.5 | SK120 | 171 | 16.5 |
E330 | 216 | 22.5 | PC60-6 | 154 | 14.5 | K907 | 175.4 | 18.5 |
E345 | 216 | 22.5 | PC100-1 | 154 | 14.5 | SK200 | 190 | 20.5 |
E350 | 228.6 | PC100-5 | 175 | 16.5 | SK300 | 203 | 20.5 | |
EX15 | 90 | PC200 | 190 | 18.5 | SK450 | 228.6 | 24.5 | |
EX30 | 101 | PC200-5 | 190 | 20.5 | SH40 | 135 | ||
EX60 | 154 | 14.5 | PC300-1 | 203 | 22.5 | SH100 | 171 | |
EX70 | 154 | 14.5 | PC300-6 | 216 | 22.5 | SH180 | 175 | |
EX100/EX120 | 171 | 16.5 | PC400-1 | 216 | 22.5 | SH200 | 190 | |
FH150 | 171 | 16.5 | PC400-5 | 216 | 24.5 | SH450 | 228 | 24.5 |
EX200 | 175.4 | 18.5 | PC400-6 | 228 | 24.5 | R55/R60 | 135 | 12.5 |
FH220 | 190 | 18.5 | PC650-8 | 228 | 24.5 | R200 | 171 | 16.5 |
EX300 | 203 | 20.5 | VIO30 | 101 | FL4 | 140 | 12.3 | |
EX700/ZX870 | 260 | 27.5 | VIO050 | 135 | FL6 | 160 | 14.5 | |
BULLDOZER | ||||||||
D3B/D3C | 155.6 | 14.5 | D20 | 135 | 12.5 | |||
D4/D4D/D4E | 171.5 | 16.5 | D30/D31 | 154 | 14.5 | |||
D4H/D5C/D5G | 171 | 16.5 | D41P-6 | 171.5 | 16.5 | |||
D5/D5B | 175 | 16.5 | D50/D51EX-22 | 175 | 16.5 | |||
D6M/D6N/D5H | 190 | D65/D65EX-12/D65-8 | 203 | 20.5 | ||||
D6D/D6R/D6H | 203 | 19.5 | D80/D85/D85ESS-2 | 216 | 20.5 | |||
D7G/D7H | 216 | 19.5 | D150/D155 | 228.6 | 24.5 | |||
D8N/D8K | 228.6 | 22.5 | D355 | 260 | 27.5 | |||
Products factory
Products show
Products testing
Products packing and shipping
Products factory
Products show
Products testing
Products packing and shipping
Product detail pictures:

Related Product Guide:
"Control the standard by the details, show the power by quality". Our business has strived to establish a highly efficient and stable team staff and explored an effective good quality regulate course of action for Factory Supply Bulldozer Track Chains - 13G-32-00010 D61EX-12 track chain track link dozer undercarriage parts – Globe Truth, The product will supply to all over the world, such as: Poland, Riyadh, Cologne, If you need to have any of our merchandise, or have other items to be produced, make sure you send us your inquiries, samples or in depth drawings. Meanwhile, aiming to develop into an international enterprise group, we look forward to receiving offers for joint ventures and other cooperative projects.

We have been appreciated the Chinese manufacturing, this time also did not let us disappoint,good job!
