2018 High quality Bulldozer Undercarriage Parts - JCB top roller carrier roller JCB200 JCB220 JCB240 JCB260 JCB300 – Globe Truth
2018 High quality Bulldozer Undercarriage Parts - JCB top roller carrier roller JCB200 JCB220 JCB240 JCB260 JCB300 – Globe Truth Detail:
Product Information
Material | 50Mn |
Finish | Smooth |
Colors | Black or yellow |
Technique | Forging casting |
Surface Hardness | HRC50-56,deepth:4mm-10mm |
Warranty time | 2000 hour |
Certification | ISO9001-9002 |
FOB Price | FOB Xiamen USD 10-100/Piece |
MOQ | 2 piece |
Delivery Time | Within 30 days after contract established |
2. Design / Structure / Details Pics
Advantages / Features:
The heat treatment automation line adopts advanced whole quenching techniques to manufacture the roller and it can meet the technical requirement of the roller. The controlling and inspecting to the production line are all fulfilled by computer system with advanced control mode and inspection method.
The flexible roller assembling line introduces multiple working stations. The rollers are automatically washed before assembling by the washer to guarantee the cleanness and sealing performance of the production.
There are more model for your reference
TRACK ROLLER | CARRIER ROLLER | |||
D20 | EX220 | R225-7 | E70B | D65 |
D31 | EX270 | R290 | E120B | D6D |
D3D | EX300 | R305 | E200B | D7G |
D4D | EX400 | R320 | E240 | D80 |
D5 | ZX330 | R360 | E300B | D85-12 |
D5B | EX1200 | EC55 | E320 | D8K |
D60-6 | PC30 | EC210/240 | E325 | DH55 |
D65 | PC40-7 | EC290 | E330 | DH150 |
D7G | PC60-3/5 | EC360 | E345 | DH220-3/5 |
D80 | PC100-3/5 | WY100 | ZX250 | DH280-2 |
D85 | PC200-3/5/6 | WY160 | ZX330 | DH280-3 |
D155 | PC300-3/5 | WY20 | EX30 | DH370 |
DH55 | PC450-3/5 | CX55 | EX55 | HD700/770 |
DH80-7 | SH60 | CX360 | EX60-5 | HD1250 |
DH220-3/5 | SH120/260 | TAMROC 600 | EX90 | MS180-3 |
DH258 | SH120A3 | IHI50 | EX70 | R80-7 |
DH280-2 | SH200 | IHI310 | EX100/120 | R130 |
DH280-3 | SH220 | YC 35 | EX1100 | R210 |
DH370 | SH280 | YC60 | EX150 | R290 |
E55 | SH300 | YC85 | EX200-1 | R320 |
E70B | SH340 | SWE35B | EX200-2/3/5 | EC55 |
E120/312 | SH430 | SWE70B | EX300-1/3 | EC210/240 |
E180 | SK55 | Furukawa1200 | EX300-5 | EC290 |
E200B | SK60 | Liebherr944 | EX400 | EC360 |
E215 | SK07N2 | ZY200-3 | PC30 | SK07N2 |
E240 | SK100/120 | ZY320 | PC60-5/6 | SK120 |
E320 | SK200 | NS50 | PC60-7 | SK200 |
E300B | SK220 | VIO75 | PC100/120 | SK220 |
E322 | SK230/250-8 | VIO75 | PC200-3/5/6 | SK230 |
E325 | SK320 | Kubota50 | PC210LC-5 | SK320 |
E330B | SK350-8 | FH200 | PC220-3 | IHI55 |
E345 | SK450 | FH220 | PC220-7 | CX55 |
E450 | HD450 | XD210 | PC300-3/5 | CX360 |
EX30 | HD770 | VA542 | PC400-3/5 | YC35 |
EX55 | HD820 | etc. | SH60 | YC60-7 |
EX60 | HD1250 | SH120/260 | YC85 | |
EX70 | HD1430 | SH200/280 | VIO55 | |
EX75 | HD2045 | SH300 | ||
EX90 | R60-5 | SH350 | Furukawa 1200 | |
EX100 | R60-7 | SH430 | R944B | |
EX150 | R80-7 | D20 | etc. | |
EX200-1 | R130 | D4D | ||
EX200-2/3/5 | R210 | D50 | ||
EX230/240 | R200 | D60-6 |
Our products are according to the standard of OEM to manufacture
Products factory
Products show
Products testing
Products packing and shipping
Products factory
Products show
Products testing
Products packing and shipping
Product detail pictures:
Related Product Guide:
We have many excellent staff members good at marketing, QC, and dealing with kinds of troublesome problem in the production process for 2018 High quality Bulldozer Undercarriage Parts - JCB top roller carrier roller JCB200 JCB220 JCB240 JCB260 JCB300 – Globe Truth, The product will supply to all over the world, such as: Jakarta, Egypt, Belarus, because of our company has been persisting in the management idea of "Survival by Quality, Development by Service, Benefit by Reputation" . We fully realize the good credit standing, the high quality products, the reasonable price and the professional services are the reason that the customers choose us to be their long-term business partner.
By Kim from Naples - 2017.07.28 15:46
Product quality is good, quality assurance system is complete, every link can inquire and solve the problem timely!
By Deirdre from Naples - 2018.02.21 12:14